9.10.4.2.(1)

Intent

Intent 1:

To supersede the requirements of Sentences 9.10.4.1.(1) to Sentence 9.10.4.1.(4), which would otherwise exempt mezzanines from the calculation of building height, and require that each level of mezzanine additional to the first level be considered as a storey in calculating building height to account for the greater travel distance and time needed to evacuate upper-level mezzanines.