4.3.2.4.(1)

Objective

OP1 Fire Protection of the Building or Facility

Attribution

Intent

Intent 1:

To limit the probability of delays and inefficiencies in conducting firefighting operations, which could lead to the spread of fire from adjacent tanks, buildings or property to the tank, which could lead to damage to the facility.

Intent 2:

To limit the probability of delays and inefficiencies in conducting firefighting operations, which could lead to the spread of fire in or associated with the tank to adjacent tanks, which could lead to damage to the facility.