4.5.6.8.(1)

Objective

OH5 Hazardous Substances Containment

Attribution

Intent

Intent 1:

To limit the probability that piping defects or damage will go unnoticed, which could lead to appropriate measures not being taken, which could lead to the escape and spread of liquid, which could lead to harm to the public.

Intent 2:

To limit the probability that ground heave or foundation settling caused by the freeze/thaw cycle will lead to failure of the piping, which could lead to the escape of liquid, which could lead to harm to the public.

Intent 3:

To supersede the requirements of Sentence 4.5.6.5.(2) and permit underground piping to be located near building foundations where it enters a building.