4.5.8.4.(2)

Objective

OP1 Fire Protection of the Building or Facility

Attribution

Intent

Intent 1:

To limit the probability that liquid will be overheated, which could lead to failure of the piping system to contain the liquid, which could lead to the escape of liquid, which could lead to the accumulation and subsequent ignition of vapour from a nearby ignition source, which could lead to damage to the building or facility.

Top of Page