5.5.5.3.(2)

Objective

OP1 Fire Protection of the Building or Facility

Attribution

(b)[F12-OP1.2]

Intent

Intent 1:

To limit the probability that delays in shutting off the gas supply will lead to the unwanted release of gases, which could lead to a fire or explosion, or the spread of fire to other parts of the building, which could lead to damage to the building.

Top of Page