5.6.1.9.(1)

Objective

OP1 Fire Protection of the Building or Facility

Attribution

Intent

Intent 1:

To limit the probability that live building services [e.g. electrical installations] will be damaged during demolition operations, which could lead to a fire or explosion, which could lead to damage to the building or facility.

Intent 2:

To limit the probability of the unwanted release of flammable liquids or vapours from live building services [e.g. gas and fuel lines] during demolition operations, which could lead to their accumulation in ignitable concentrations, which could lead to a fire or explosion, which could lead to damage to the building or facility.

Top of Page