Intent 1:
To supersede the requirement in Sentence 5.6.1.11.(2), where it is impracticable to remove drained and
purged equipment prior to demolition, but only if measures are taken
to:
- limit the probability of damage to the equipment during
demolition operations [identification], and
- eliminate the vapour ignition hazard as soon as possible
[removal].