2.2.1.6.(1)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that internal pressure will lead to the failure of water service pipes, which could lead to the leakage of liquids, which could lead to damage to the building or facility.

Top of Page