2.3.3.12.(2)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that the inability to easily access a joint and repair it will lead to joint failure, which could lead to leakage, which could lead to damage to the building or facility.

Top of Page