2.3.3.9.(1)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that an inappropriate design will lead to an inability to accommodate shrinkage, settlement, or temperature- or soil-related expansion and contraction of piping systems, which could lead to the failure of pipes, joints or fixtures, which could lead to leakage, which could lead to damage to the building or facility.

Top of Page