2.4.10.12.(1)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that hydraulic load drained to inappropriately sized traps will lead to a backup or overflow, which could lead to damage to the building or facility.

Top of Page