2.1.2.1.(2)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that drainage systems will be overloaded, which could lead to raw sewage and storm water backing up into buildings, which could lead to flooding in buildings, which could lead to damage to the building or facility.

Top of Page