2.2.5.2.(1)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that asbestos-cement water pipe, couplings and bends will not meet proper standards, which could lead to such pipe, couplings and bends not performing in the way intended, which could lead to the failure of the pipe, which could lead to leakage or flooding, which could lead to damage to the building or facility.

Top of Page