2.2.5.2.(2)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that the pipe will be subject to mechanical or physical damage, which could lead to the failure of the pipe, which could lead to leakage or flooding, which could lead to damage to the building or facility.