2.2.5.5.(2)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that polyethylene water pipe [and associated fittings] will be used for a purpose other than as a water service pipe [e.g. hot water service], which could lead to the failure of the pipe or associated fittings due to the inability of the pipe material to withstand service conditions, which could lead to leakage or flooding, which could lead to damage to the building or facility.

Top of Page