2.2.5.7.(1)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that crosslinked polyethylene pipe and associated fittings will not meet proper standards, which could lead to such fixtures not performing in the way intended, which could lead to failure, which could lead to leakage or flooding, which could lead to damage to the building or facility.