2.2.5.8.(2)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that PVC water pipe fittings will not meet proper standards, which could lead to such fittings not performing in the way intended, which could lead to the failure of the fittings, which could lead to leakage or flooding, which could lead to damage to the building or facility.

Top of Page