2.2.5.9.(2)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that normal operating temperatures and pressures will lead to the failure of CPVC piping systems, which could lead to leakage or flooding, which could lead to damage to the building or facility.

Top of Page