2.2.5.13.(1)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that the performance of the PE/AL/PE composite pipe and fittings will fall significantly below expectations, which could lead to the failure of such pipe and fittings, which could lead to leakage, which could lead to damage to the building or facility.

Top of Page