2.2.7.5.(2)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that fittings that are incompatible with jointing methods and service conditions, for pressurized water systems, will lead to water system failure, which could lead to leakage, which could lead to damage to the building or facility.

Top of Page