2.2.10.8.(1)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

(a) and (b)[F80,F81-OP5]

Intent

Intent 1:

To limit the probability that an inappropriate design will lead to failure to shut off, which could lead to flooding, which could lead to damage to the building or facility.

Top of Page