2.2.10.14.(2)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that performance of prefabricated flashing will fall significantly below expectations, which could lead to inadequate water resistance or inadequate strength, which could lead to failure, which could lead to roof leakage, which could lead to damage to the building or facility.

Top of Page