2.3.2.5.(2)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that the use of inappropriate materials will lead to cracking of pipes, which could lead to joint failure, which could lead to leakage, which could lead to damage to the building or facility.

Top of Page