2.3.3.2.(1)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that:

  • inappropriate tools will be used, which could lead to inadequate joint strength,
  • excessively large branch sizes will be used, which could lead to excessive weakening of run tubes, or
  • the strength of brazing material will be inadequate, which could lead to inadequate joint strength.

This is to limit the probability of joint failure, which could lead to leakage, which could lead to damage to the building or facility.

Top of Page