2.3.4.3.(1)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that electrically incompatible materials will lead to galvanic or electrolytic corrosion, which could lead to the failure of tubing or pipes, which could lead to leakage, which could lead to damage to the building or facility.

Top of Page