2.3.4.4.(2)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that excessive support spacing will lead to an inability of pipes or joints to resist expected compressive and tensile stresses due to self-weight, which could lead to the failure of pipes or joints, which could lead to leakage, which could lead to damage to the building or facility.

Top of Page