2.3.4.5.(1)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that inadequate bracing will lead to excessive swaying or buckling, which could lead to the failure of the piping system, which could lead to leakage, which could lead to damage to the building or facility.