2.3.7.1.(3)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that a failure to conduct tests will lead to undetected leakage in prefabricated potable water systems, which could lead to damage to the building or facility.

Top of Page