2.4.10.4.(2)

Intent

Intent 1:

To supersede the requirement in Sentence 2.4.10.4.(1) for hydraulic load assumptions, where flow control roof drains are installed, on the basis that water will be held on roof surfaces for a controlled period of time.

Top of Page