2.6.1.9.(1)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that inadequate protection of water pipes will lead to excessive water hammer, which could lead to water distribution system failure, which could lead to damage to the building or facility.

Top of Page