2.6.1.11.(1)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that inadequate protection will lead to an inability to resist pressure buildup in a closed loop due to thermal expansion of water within a closed water distribution system, which could lead to damage to or failure of pipes or fittings, which could lead to leakage, which could lead to damage to the building or facility.