2.6.3.5.(1)

Objective

OP5 Protection of the Building or Facility from Water and Sewage Damage

Attribution

Intent

Intent 1:

To limit the probability that a lack of protection against excessive flow velocities in water system piping will lead to erosion of the piping material, which could lead to the rupturing of piping, which could lead to damage to the building or facility.

Top of Page