8.4.4.12.(5)

Objective

OE1 Resources

Attribution

Intent

Intent 1:

To limit the probability that the pumping flow rate will be set at an inadequate value, which could lead to inaccuracy of the model, which could lead to overestimation of the energy used by the reference building, which could lead to excessive use of energy, which could lead to an unacceptable effect on the environment.

Top of Page