This information has been archived because it is outdated and no longer relevant.
Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.
3.2.2.56.(1) | Application | Intent |
+ | + | OS1 | OP1 |
Objective | OP1 Fire Protection of the Building |
Attribution | |
Application | Application 1: Automatic sprinkler system in a storey in
which more than 10% of the area is classified as a Group D major
occupancy. This applies in buildings whose building area is restricted to:
This applies to buildings to
which Part 3 applies [see Sentence 1.3.3.2.(1) of Division A for application
of Part 3].
Exceptions:
except:
|
Top of Page | |
Intent | Intent 1: To limit the probability that loadbearing walls, columns
and arches exposed to fire will prematurely fail or collapse, which could
lead to the failure or collapse of supported floor or roof assemblies during
the time required to achieve occupant safety and for emergency responders
to perform their duties, which could lead to damage to the building.
Intent 2: To limit the probability that floor or roof assemblies exposed
to fire will prematurely fail or collapse during the time required to achieve
occupant safety and for emergency responders to perform their duties, which
could lead to damage to the building. Intent 3: To limit the probability that loadbearing walls, columns
and arches exposed to fire will prematurely fail or collapse, which could
lead to the failure or collapse of supported floor assemblies, which could
lead to the spread of fire from a lower storey of a building to an upper storey
or to the exterior during the time required to achieve occupant safety and
for emergency responders to perform their duties, which could lead to damage
to the building. Intent 4: To limit the probability that floor or roof assemblies exposed
to fire will prematurely fail or collapse, which could lead to the spread
of fire from a lower storey of a building to an upper storey or to the exterior
of the building during the time required to achieve occupant safety and for
emergency responders to perform their duties, which could lead to damage to
the building. Intent 5: To limit the probability that, in the event of a fire, the
absence of fire suppression systems within a storey will lead to the growth
of fire, which could lead to the spread of fire within the storey during the
time required to achieve occupant safety and for emergency responders to perform
their duties, which could lead to damage to the building. |
Top of Page |