This information has been archived because it is outdated and no longer relevant.
Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.
9.5.2.3.(2) | Application | Intent |
+ |
Application | Application 1: Provision of a barrier-free path
of travel, in buildings to which Part 9 applies
[see Sentence 1.3.3.3.(1) of Division A for application of Part 9], where
the difference in floor elevation between the entrance level and every dwelling unit exceeds 600°mm. |
Top of Page | |
Intent | Intent 1: To exempt, from the requirement for a barrier-free path
of travel stated in Sentence 9.5.2.1.(1), areas of buildings that are
not equipped with an elevator and where there are no dwelling units on the
entrance level. |
Top of Page |