Warning This information has been archived because it is outdated and no longer relevant.

Archived Content

Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.

9.10.5.1.(4)
OS1OP1
ObjectiveOS1 Fire Safety
Attribution
Application
Application 1: 
Openings, leading to ducts within a ceiling space, that pierce a membrane ceiling forming part of an assembly assigned a fire-resistance rating on the basis of Table A-9.10.3.1.B. or Appendix D, where the ducts, the amount of openings and their protection conform to the requirements of Appendix D.
This applies to buildings to which Part 9 applies [see Sentence 1.3.3.3.(1) of Division A for application of Part 9].
Top of Page
Intent
Intent 1: 
To exempt openings leading to ducts from the requirements of Sentence 9.10.5.1.(1), which would otherwise not permit openings in rated ceiling membranes, if certain conditions are met [i.e. the ducts, the amount of openings and their protection conform to the requirements of Appendix D].
This is to limit the probability that openings into rated ceiling membranes will contribute to the spread of fire within the ceiling space, which could lead to the premature failure or collapse of the structure within the ceiling space, which could lead to harm to persons.
Intent 2: 
To make the provisions in Appendix D mandatory with respect to:
  • area, size, spacing and support of openings,
  • materials, clearance to ceiling membrane and support for ducts, and
  • thermal protection and fire stop flaps for ducts.
Top of Page