This information has been archived because it is outdated and no longer relevant.
Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.
9.13.4.6.(2) | Application | Intent |
OH1 |
Objective | OH1 Indoor Conditions |
Attribution | |
Application | Application 1: Minimum diameter of soil gas
extraction pipes and their installation through interior floors that are in
contact with the ground, in buildings to which
Part 9 applies [see Sentence 1.3.3.3.(1) of Division A for application
of Part 9] that contain a single dwelling unit that
is provided with a means to install a sub-floor depressurization system.
|
Top of Page | |
Intent | Intent 1: To limit the probability of the inappropriate location,
size and configuration of soil gas extraction pipes, which could lead to the
infiltration of soil gas (particularly radon), which could lead to negative
effects on the air quality of indoor spaces, which could lead to harm to persons.
|
Top of Page |