This information has been archived because it is outdated and no longer relevant.
Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.
9.13.4.6.(4) | Application | Intent |
OH1 |
Objective | OH1 Indoor Conditions |
Attribution | |
Application | Application 1: Seals for soil gas extraction
pipes installed through interior floors that are in contact with the ground,
in buildings to which Part 9 applies [see Sentence 1.3.3.3.(1) of Division A for application of Part 9] that contain a
single dwelling unit that is provided with a
means to install a sub-floor depressurization system.
|
Top of Page | |
Intent | Intent 1: To limit the probability that open and unconnected soil
gas extraction pipes will lead to the infiltration of soil gas (particularly
radon), which could lead to negative effects on the air quality of indoor
spaces, which could lead to harm to persons. |
Top of Page |