Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.

9.14.5.1.(1)
OH1OS2OP2
ObjectiveOP2 Structural Sufficiency of the Building
Attribution
Application
Application 1: 
Foundation drains for buildings to which Part 9 applies [see Sentence 1.3.3.3.(1) of Division A for application of Part 9].
Top of Page
Intent
Intent 1: 
To limit the probability of an inappropriate means of water disposal, which could lead to excessive moisture loading on foundation walls and basement floors.
This is to limit the probability of the accumulation of water under hydrostatic pressure, which could lead to:
  • compromised structural integrity of foundation walls and basement floors, or of elements supported by the walls or floors, or
  • deterioration, which could lead to compromised integrity of elements supported or protected by exterior foundation walls.
This is to limit the probability of:
  • the space being unsuitable for its intended use, or
  • damage to the building.
Intent 2: 
To limit the probability of excessive moisture loading on the soil immediately beneath the footings, which could lead to saturation and a reduction in the soil's bearing capacity, which could lead to the failure of foundation walls and basement floors, which could lead to damage to the building.