Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.
9.14.6.1.(1) | Application | Intent |
OH1 | OS2 | OP2 |
Objective | OS2 Structural Safety |
Attribution | |
Application | Application 1: Location or grading of buildings to
which Part 9 applies [see Sentence 1.3.3.3.(1) of Division A for application
of Part 9]. |
Top of Page | |
Intent | Intent 1: To limit the probability of inadequate grading of the building
site, which could lead to excessive moisture loading on foundations.
This is to limit the probability of the accumulation of water under
hydrostatic pressure, which could lead to:
This is to limit the probability of harm to persons.
Intent 2: To limit the probability of inadequate grading of the building
site, which could lead to excessive moisture loading on the soil immediately
beneath the footings, which could lead to saturation and a reduction in the
soil's bearing capacity, which could lead to the failure of foundation walls
and basement floors, which could lead to harm to persons. |