This information has been archived because it is outdated and no longer relevant.
Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.
9.18.6.2.(3) | Application | Intent |
OH1 |
Objective | OH1 Indoor Conditions |
Attribution | |
Application | Application 1: Perimeter sealing of ground cover in heated crawl
spaces whose exterior walls have less than 25% of their total area above exterior
ground level open to the outdoors, in buildings to
which Part 9 applies [see Sentence 1.3.3.3.(1) of Division A for application
of Part 9]. |
Top of Page | |
Intent | Intent 1: To limit the probability of discontinuity between the ground
cover and the soil gas control component in foundation walls, which could
lead to the infiltration of soil gas, which could lead to negative effects
on the air quality of indoor spaces, which could lead to harm to persons.
|
Top of Page |