Warning This information has been archived because it is outdated and no longer relevant.

Archived Content

Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.

9.20.11.5.(1)
OS2
ObjectiveOS2 Structural Safety
Attribution
Application
Application 1: 
Placement or anchorage of cornices, sills or other trim of masonry material that project beyond the wall face in above-ground masonry walls, in buildings to which Part 9 applies [see Sentence 1.3.3.3.(1) of Division A for application of Part 9]:
  • where the wall height above the foundation wall does not exceed 11 m, and
  • in which the roof or floor system above the first storey is not of concrete construction.
Exceptions: 
except as stated in Sentence 9.20.1.1.(2), which applies to buildings other than described above, or where the masonry is designed for specified loads on the basis of ultimate and serviceability limit states.
Top of Page
Intent
Intent 1: 
To limit the probability of inadequate placement or anchorage, which could lead to masonry trim falling from a building face, which could lead to harm to persons.
Top of Page