This information has been archived because it is outdated and no longer relevant.
Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.
9.24.3.1.(4) | Application | Intent |
OH1 | OS2 | OP2 | OS3 | OS1 |
Objective | OP2 Structural Sufficiency of the Building |
Attribution | |
Application | Application 1: Provision, installation and fastening of runners to
support the ends of studs at openings, where the studs are not full wall height,
in non-loadbearing exterior and interior walls
of buildings to which Part 9 applies [see Sentence 1.3.3.3.(1) of Division A for application of Part 9]. |
Top of Page | |
Intent | Intent 1: To limit the probability of inadequate means to anchor wall
assemblies at openings, or inadequate means for the top and bottom attachment
of cladding, sheathing or interior finish materials, which could lead to:
This is to limit the probability of the excessive
movement or deformation of walls, which could lead to:
This is to limit the probability of:
|
Top of Page |