Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.
9.26.11.7.(1) | Application | Intent |
OH1 | OS2 |
Objective | OS2 Structural Safety |
Attribution | |
Application | Application 1: Installation of hot-process-application, built-up
roof membranes, on buildings to which Part 9 applies
[see Sentence 1.3.3.3.(1) of Division A for application of Part 9].
|
Top of Page | |
Intent | Intent 1: To limit the probability of the inadequate adhesion of plies
to each other, which could lead to inadequate tensile strength, resistance
to traffic loads or resistance to water infiltration and freeze-thaw cycling,
which could lead to tearing or puncturing of membranes, which could lead to
water penetrating directly to roof decking or sheathing, which could lead
to deterioration, which could lead to the structural failure of roofs or assemblies
protected by roofs, which could lead to harm to persons. |
Top of Page |