Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.
9.26.11.8.(2) | Application | Intent |
OH1 | OS2 |
Objective | OH1 Indoor Conditions |
Attribution | |
Application | Application 1: Installation of built-up roofing applied over plywood,
OSB or waferboard roof sheathing, on buildings to
which Part 9 applies [see Sentence 1.3.3.3.(1) of Division A for application
of Part 9], where the joints of plywood, OSB or waferboard are taped and the
sheathing is primed with asphalt. |
Top of Page | |
Intent | Intent 1: To exempt from the requirement for a dry layer of felt as
stated in Sentence (1), constructions where taped
joints and primed sheathing provide extra protection against the absorption
and leakage of rain or meltwater [same intent as Sentence 9.26.11.8.(1)].
|
Top of Page |