This information has been archived because it is outdated and no longer relevant.
Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.
9.26.11.10.(1) | Application | Intent |
OH1 | OS2 | OS3 |
Objective | OS2 Structural Safety |
Attribution | |
Application | Application 1: Cant strips for built-up roofs, on buildings to
which Part 9 applies [see Sentence 1.3.3.3.(1) of Division A for application
of Part 9].
Exceptions:
except as stated in Sentence 9.26.11.10.(4), which applies where
a gravel stop is installed at the edge.
|
Top of Page | |
Intent | Intent 1: To limit the probability of uncontrolled drainage from roofs
during rainstorms, where the capacity of roof drains is exceeded, which could
lead to water accumulating and penetrating exterior walls, which could lead
to deterioration, which could lead to the structural failure of roofs or assemblies
protected by roofs, which could lead to harm to persons. |
Top of Page |