Warning This information has been archived because it is outdated and no longer relevant.

Archived Content

Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.

9.26.11.10.(2)
OH1OS2
ObjectiveOH1 Indoor Conditions
Attribution
Application
Application 1: 
Built-up roofs, on buildings to which Part 9 applies [see Sentence 1.3.3.3.(1) of Division A for application of Part 9], where a cant strip has been installed at the edge of the roof.
Top of Page
Intent
Intent 1: 
To limit the probability of an inadequate resistance to mechanical stresses or stresses related to structural movement or traffic, which could lead to tearing or splitting of a single ply of roofing membrane, which could lead to:
  • water accumulating and penetrating exterior walls, or
  • compromised thermal performance of components intended to provide resistance to heat transfer.
This is to limit the probability of:
  • an inadequate control of relative humidity, temperatures of interior spaces or water accumulation,
  • the generation of pollutants from biological growth or from materials that become unstable on wetting, or
  • deterioration, which could lead to compromised integrity of roofs or assemblies protected by roofs.
This is to limit the probability of:
  • negative effects on the air quality of indoor spaces,
  • the inadequate thermal comfort of persons, and
  • contact with moisture.
This is to limit the probability of harm to persons.
Top of Page