Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.

9.28.6.3.(1)
OH1OS2OS1OS3OP1
ObjectiveOS2 Structural Safety
Attribution
Application
Application 1: 
Minimum thickness of the first coat of stucco, on buildings to which Part 9 applies [see Sentence 1.3.3.3.(1) of Division A for application of Part 9].
Top of Page
Intent
Intent 1: 
To limit the probability of:
  • drying before hydration is complete (or inadequate curing),
  • the inadequate embedment of lath, which could lead to the corrosion of lath, or
  • the excessive shrinkage of stucco under gravity or lateral loads, which could lead to cracking.
This is to limit the probability of an inadequate bond between lath and stucco, and the inadequate strength of stucco, which could lead to:
  • excessive moisture transfer by capillary action, or
  • inadequate strength to resist gravity, lateral, impact or abrasion loads, or freeze-thaw stresses.
This is to limit the probability of:
  • precipitation or meltwater ingress, which could lead to deterioration, which could lead to the structural failure of exterior walls or elements protected by exterior walls, or
  • stucco detaching and falling from the building.
This is to limit the probability of harm to persons.