This information has been archived because it is outdated and no longer relevant.
Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.
9.32.3.12.(4) | Application | Intent |
OH1 | OS2 | OS3 |
Objective | OS2 Structural Safety |
Attribution | |
Application | Application 1: Start-up procedures recommended by manufacturers for
heat recovery ventilators, in self-contained heating-season mechanical ventilation
systems serving single dwelling units with 5
or fewer bedrooms that are supplied with electrical power and a heating system,
in buildings to which:
Exceptions:
except as stated in Sentence 9.32.3.1.(1), which applies to
heating-season mechanical ventilation systems designed to comply with CAN/CSA-F326-M.
|
Top of Page | |
Intent | Intent 1: To limit the probability of inappropriate or incomplete
start-up procedures, which could lead to unbalanced airflow, which could lead
to excessive positive pressure, which could lead to condensation within assemblies,
which could lead to the deterioration of building elements, which could lead
to structural failure, which could lead to harm to persons. |
Top of Page |