Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.
8.2.5.4.(1) | Application | Intent |
OS5 |
Objective | OS5 Safety at Construction and Demolition Sites |
Attribution | |
Application | Application 1: Chutes used for the disposal of waste material, as
required in Clause 8.2.5.2.(1)(b). This applies
at sites where buildings are undergoing construction, alteration or demolition, including any incomplete or
abandoned buildings.
|
Top of Page | |
Intent | Intent 1: To limit the probability that waste material will not be
controlled or confined to the chute during disposal operations, which could
lead to the waste material falling outside the chute, which could lead to
waste material falling onto persons in the vicinity of the site, which could
lead to harm to persons. |